Historical Overview (for Archives)
Gerrish Lyon Utility Authority (GLUA)
GLUA is a joint commission formed by Gerrish Township and Lyon Township to address wastewater impacts within the Higgins Lake watershed. Its mission was to plan and manage a modern wastewater treatment system to protect public health and preserve environmental resources.
Key Milestones
- Sewer Feasibility Study Presentation, Public Meeting, October 28, 2019
- May 26, 2021 – Proposed Higgins Lake Public Sewer System documentation released
- April 18, 2024 – Wastewater System Summary published, reflecting updated system planning and costs
- Because Higgins Lake is largely groundwater-fed, these findings demonstrate a connection between septic systems, groundwater, and the lake
- November 2024 – Lyon Township actions halted all remaining sewer-related activity
- 2025 – Gerrish Lyon Utility Authority (GLUA) disbanded
Scientific & Policy Context
(Supporting Research)
Septic Systems as a Primary Source of Fecal Contamination
- A 2015 peer-reviewed study led by Joan B. Rose, Michigan State University, found that high concentrations of septic systems are the primary driver of human-sourced fecal bacteria in large watersheds
- The Higgins Lake watershed contains approximately 4,000 septic systems, placing it well above the threshold identified in the study
- The research concluded that watersheds with more than 1,621 septic systems show significantly higher concentrations of human fecal markers
Linked Study:
Statewide Septic System Concerns
In The Sixth Great Lake, FLOW (For Love of Water) reports:
- 2025 – Gerrish Lyon Utility Authority (GLUA) disbanded
- Failing systems discharge an estimated 31 million gallons of raw sewage per day into groundwater statewide